Hydraulic and Hydrological Study of A Bridge in The Urema River in the Gorongosa National Park

Image
BETAR was contracted by Gorongosa National Park to study a river crossing to benefit tourists visiting the park to cross to the other side of the Urema River.

BETAR hired CONSULTEC to do the hydrological and hydraulic site for the construction of a bridge over the Urema River, tributary of the Pungoé River, whose alignment is in the African Rift, creating a special wetland with a lake where many animals find their habitat.

    1/1
INFORMATION
Activity
Water
Location
Sofala Province
Year
03/2014
Client
BETAR
Associated companies
N/A
State
Completed
TEAM
Project Coordinator
Isabel Vaz
Hydraulic Engineer
José Manane

PROJECT SHEET