Process for Assessing the Effectiveness of Implementing Risk Control Measures and Contingency Measures for Risk Reduction to ALARP

Image
The project consisted on assessing the effectiveness of implementing risk control measures and contingency measures to reduce risks to ALARP, as an integral part of the Health, Safety, and Environment Risk Management Plan in selected critical scenarios.

The report prepared under the project was:

  • A full report on the review of the effectiveness of the implementation of risk control measures and contingency measures to reduce risks to ALARP.