Supervision of The Rehabilitation of The Protection Dams of Xai-xai City Home|Projects|Supervision of The Rehabilitation of The Protection Dams of Xai-xai City Downstream the confluence between the Limpopo River and the Elephants River, a dyke system was erected that passes through the city of Chókwè and the city of Xai-xai, with the purpose of protecting these cities and the irrigation schemes of the Limpopo River in Chókwè and Xai-Xai. As a consequence of the floods that occurred in January 2013, the Chókwè and Xai-xai dykes were damaged, affecting not only the cities but the respective irrigation schemes, the hydro-mechanical facilities of Macarretane Dam and the downstream stilling basin, the approach works of a bridge over the Limpopo. The works were divided in several contracts and this contract envisaged only the repair of Xai-xai dyke. Tasks performed by CONSULTEC: Supervision off earthworks Material quality control Topographical control of execution and measurements of works Supervision of the works of reinforced concrete and hydro-mechanical structures Measurement of the Contractor’s work Other tasks contained in the Quality Assurance Plan 1/1 INFORMATION Activity Roads Location Gaza Province Year 12/2015 Client DNA - National Water Directorate Associated companies N/A State Completed TEAM Carlos Caupers Luís Zambujo Gomes Vilanculos PROJECT SHEET Download PDF Projects